Customization: | Available |
---|---|
Application: | Wall/Roof/Floor |
Feature: | Environmental, Light Weight, Fireproof, Waterproof |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Testing Indexes | |||||
Thinkness[mm] | 60 | 75 | 90 | 120 | 150 | 180 |
Anti-impact Capacity/Items [standard sandbags/times] |
≥5 | ≥5 | ≥5 | ≥5 | ≥5 | ≥5 |
Anti-bending Damage Load [times over deadweight] |
≥3.0 | ≥3.0 | ≥3.0 | ≥5.0 | ≥5.0 | ≥7.0 |
Compressive Stregth [Mpa] | ≥3.5 | ≥3.5 | ≥3.5 | ≥3.5 | ≥3.5 | ≥3.5 |
Softening Coefficient | ≥0.8 | ≥0.8 | ≥0.8 | ≥0.8 | ≥0.8 | ≥0.8 |
Surface Density [kg/m2] | ≤70 | ≤70 | ≤90 | ≤110 | ≤110 | ≤130 |
Moisture Rate [%] | ≤10 | ≤10 | ≤10 | ≤8 | ≤8 | ≤8 |
Drying Shrinkage Value [mm/m] | ≤0.5 | ≤0.5 | ≤0.5 | ≤0.5 | ≤0.5 | ≤0.5 |
Hang Force [N] | ≥1000 | ≥1000 | ≥1000 | ≥1000 | ≥1000 | ≥1000 |
Sound Insulation Capacity In The Air [dB] | ≥35 | ≥35 | ≥40 | ≥45 | ≥50 | ≥55 |
Fire Endurance [H] | ≥1.5 | ≥1.5 | ≥2.5 | ≥3.0 | ≥4.5 | ≥6.5 |
Heat Transfer Coefficient [W/m2.k] | ≤2.0 | ≤2.0 | ≤2.0 | ≤2.0 | ≤2.0 | ≤2.0 |
Inner Radiation Index | ≤1 | ≤1 | ≤1 | ≤1 | ≤1 | ≤1 |
Outer Radiation Index | ≤1 | ≤1 | ≤1 | ≤1 | ≤1 | ≤1 |
widely used:
office,residential building,school,hospital,hotel,public construction,entertainment place.1. Setting the line and carrying the board into position
2. Using hand-hold electric saw freely according to the specification of wall,
3. Sizing the bump slot and then spread the baseline and the bump slots with the EPS special adhesives
4. Carrying the board prepared to be installed to the installation place, correcting the wall board by Special tools, and making it close tightly, and let the polymer mortar squeeze out into full and then fixing it with a wedge temporarily
5. Correcting, fixing
Using a guiding rule of two meters to check the vertical and leveling correction. Then using 6mm or 8mm reinforcing steel bar and ribs adding with construction sealant to fix.
6. Grooving and piping
Cutting a groove by a hand-hold electric saw for burying the concealed wire and switch box.Then filling with polymer mortar after installation.
7. Sticking anti-cracking tape
8. Installing doorcase
9. Facing ceramic tile, decorative sheet, coating and wall paper sticking ceramic tiles,or wood facing panels and coating directly on the installed wall without plastering.
1).Held by wooden Pallet or without Pallet;
2).Bonded with plastic belts;
3).Fasten around the corners;