Customization: | Available |
---|---|
Feature: | Environmental, Fireproof, Light Weight |
Fire Rating: | 4 |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEM | DESCRIPTION |
Product | EPS cement sandwich panel |
Composition | 5mm Calcium silicate board (face board) + EPS/Cement/Sand(core material) + 5mm Calcium silicate board (face board) |
Character | lightweight, insulation, fireproof, waterproof, fast installation, and environmental etc |
Application | Floor, Roofing, Wall, Villa, Prefabricate house, Building, School, Hotel... |
Dimension | Length Width Thickness 60mm 2270mm 75mm 610mm 90mm 2440mm 100mm 120mm 150mm |
Packaging & Shipping | Packed with plastic film, protected by belt and place in pallet |
Sample | Free sample, shipping charge by customers. |
Certificate | SGS, TUV, Fire insulation certificate, Sound transmission loss certificate... |
1) Setting the line and carrying the board into position | Eject double lines of board thickness up and down the axes of installed wall board, and easily carry to the side of wall according to the specification needed; |
2) Sawing board | Using a hand-hold electric saw freely according to the specification of wall, which can reduce the loss rate; |
3) Sizing | Sizing the bump slots and then spread the baseline and the bump slots with the special adhesives; |
4) Installation | Carrying the board prepared to be installed to the installation place, correcting the wall board by gave lock and making it close tightly, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily; |
5) Correcting and fixing | Using the guiding rule of two meters to check the vertical and leveling correction. Then using 6mm reinforcing steel bar and ribs adding with construction sealant to fix; |
6) Grouting and filing starch | Using ZJT special adhesives to fill the gaps between the corrected wall boards after one day later. Then putting the chock out and letting the corrected wall smoothly with polymer mortar; |
7) Grooving and piping | Cutting a groove by hand-hold electric saw for buring the concealed wire and switch box, then filling with polymer mortar after installation; |
8) Sticking anti-cracking tape | After grouting 3-5 days later, sticking anti-crack tape if need second decoration or attaching fiber mesh cloth; |
9) Installing door case | Preparing a door and window hole on the installed wall, anchoraging it with splint or lines; |
10) Facing ceramic tile, decorative sheet, coating and wallpaper | Sticking ceramic tiles, or wood facing panels and coating directly on the installed wall without plastering; |