Customization: | Available |
---|---|
Feature: | Environmental, Fireproof, Light Weight |
Materials: | Calcium Silicate Board |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Buildings Insulated Material EPS Cement Sandwich Concrete Panel for Partition Wall
Concrete Panel Information
Material |
5mm fireproof calcium silicate board+ Flameresistant EPS+Cement+Sand+Fly ash |
Size |
Length: 2270/2440mm |
Width: 610mm |
|
Thickness: 60/75/90/100/120/150mm |
|
Character |
Fireproof, heat insulation, saving time and space, easy install, lightweight, waterproof |
Accessories |
Cement mortar, Anti-crack tape, Steel bar, Cutting machine (we could offer if needed) |
Connection way |
Tongue&Groove |
MOQ |
One container |
Production lead time |
7-20days after receive deposit |
Payment terms |
1. T/T 30% deposit before production, T/T balance after receiving scan of documents. 2. L/C at sight |
Application of Concrete Panel
1. Partition,indoor wall, outdoor wall of non load bearing wall
2. The renovation of the old buildings
3. Other condition which have strong requirements of the moisture proof, waterproof, fireproof, sound insulation.
Length |
Width |
Thickness |
Density |
Application |
Appearance |
|
|
60 |
38±2% |
Non-load bearing wall |
With calcium silicate |
75 |
47±2% |
||||
90 |
56±2% |
||||
100 |
65±2% |
||||
120 |
74±2% |
||||
150 |
93±2% |
FAQ
Q:Are EPS cement sandwich panel advisable to use on high rise buildings, consider the structural load on the foundation?
A:EPS cement sandwich panel are most recommended to be used on high rise buildings. Because it's lightweight characteristics.
Q:How to build with EPS cement sandwich panel?
A:EPS cement sandwich panel can be used for walls, floor and roof deck of building. EPS cement sandwich panel are much like regular concrete panels. Panels are set in place with the specific mortar (we can offer).
Q:Is EPS cement sandwich panel lightweight?
A:Yes, it is. Capacity six hundred and fifty to eight hundred KG per cubic meter, it is one sixth of brick wall , even is one half of aerated concrete block.
Q:Is EPS cement panel fireproof?
A:Yes, it is. It control fire slipping out of the origin unit, prevent fire spreading, prevent toxic gas generating or insulating Through fire high temperature test for four hours, panels only have skin injury.
Q:Being lightweight does EPS cement sandwich panel have the same strength like concrete panels or bricks?
A:EPS cement sandwich panel is designed with dimensional accuracy and comprehensive strength. It can be used in many loading bearing application. Weather it is a large, small or tall job. EPS cement sandwich panel walls installed using specific mortar function as a monolithic structure. It provides better strength as compared to the concrete block, clay brick building.
Installation of Concrete Panel
1. Paying-off and Sandwich Wall Panels Arrived on Site
Adopting high precision laser alignment instrument to eject double lines of panel thickness on axial line of panel installation location, move the panel to the settled location according to different specifications.
2. Sawing Panel According to Requirement
Adopting hand-hold electric saw cutting the panel according to different need, make sure maximum using each panel to reduce the waste.
3. Sizing
Sizing the bump slots and even up the special ZJT panel adhesive into the bump slots and baseline of the floor.
4. Installation
Erected the painted panel with adhesive and move it to the prepared installation site, adjusting the panel to fit both of the baseline and tighten each panel to push the extra polymer mortar out of the joint crack, fixing the panel by wooden wedge.
5. Correction and Fixation
Correcting the panel position by using 2m levelness & verticality straight guide rule, adopting expansion rubber together with 6mm or 8mm steel bar to fix the panel.
6. Grouting and Filling Thick Liquid
Leave the installed and corrected panel for one day, adopting BOYUEJIA special panel adhesive to filling the joint crack. Remove wooden wedge and smooth the crack by polymer mortar.
7. Slotting and Wiring
Adopting hand-electric saw to cut the slotting for switch box or concealed line if needed, smooth the slotting by polymer mortar after installation.
8. Sticking Anti-Crack Tape
Sticking anti-crack tape in 3-5 days after grouting to prevent crack which may caused by long time expansion or contraction.
9. Installing Door Frame
Reserve holes for door and window, and fixing the holes by plywood line anchor.
10. Decoration
Sandwich wall panel do not need extra plaster for the surface, decorating the wall surface directly by tiles, wallpaper or other painting.
Contact Us
Dear friend, if you are interested in our product and have any problems, don't hesitate to e-mail me.
Xiamen ZhongJingTai Building Materials CO., Ltd.
Contact Person: Freda Lin
Website: http://zjteps.en.made-in-china.com
Company Address:
Unit 2A, Lianchang Building, No 6-8Huli District,Xiamen, China.