Customization: | Available |
---|---|
After-sales Service: | 5years |
Application: | Exterior Wall Of Building, Roof, Wall Panel, Partition Wall Panel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dear friend, if you are interested in our product and have any problems, don't hesitate to e-mail me.
Freda LinEPS cement sandwich panels are a popular choice in modern construction. The two outer cement - based facings are formulated to resist weathering and mechanical stress. The EPS foam in - between is a lightweight, closed - cell material. This combination results in a panel that is both light and strong. During production, the cement slurry is carefully applied to both sides of the pre - formed EPS board, followed by curing to enhance the bond. The surface of these panels can be smooth or textured. With a natural gray - white color from the cement, they can also be pigmented. They meet various national and industry standards regarding strength, insulation, and fire resistance.
High efficiency and short construction period
The composite wall panel is easy to install and does not need bricklaying, so it can shorten the construction period, that is, ready to use. The slotting is quick, the water and electricity pipeline is easy to install, and the construction efficiency is several times that of the general masonry. Install a wall panel (1.49) = masonry 120 standard bricks + 7.2M2 (double-sided secondary) plastering, every ordinary worker can install 30M2 wallboard on average every day, ie = technical workers masonry 1500 bricks +86M2 plastering.
1 | Paying-off and Sandwich Wall Panels Arrived on Site | Adopting high precision laser alignment instrument to eject double lines of panel thickness on axial line of panel installation location, move the panel to the settled location according to different specifications. |
2 | Sawing Panel According to Requirement | Adopting hand-hold electric saw cutting the panel according to different need, make sure maximum using each panel to reduce the waste. |
3 | Sizing | Sizing the bump slots and even up the special ZJT panel adhesive into the bump slots and baseline of the floor. |
4 | Installation | Erected the painted panel with adhesive and move it to the prepared installation site, adjusting the panel to fit both of the baseline and tighten each panel to push the extra polymer mortar out of the joint crack, fixing the panel by wooden wedge. |
5 | Correction and Fixation |
Correcting the panel position by using 2m levelness & verticality straight guide rule, adopting expansion rubber together with 6mm or 8mm steel bar to fix the panel. |
6 | Grouting and Filling Thick Liquid | Leave the installed and corrected panel for one day, adopting BOYUEJIA special panel adhesive to filling the joint crack. Remove wooden wedge and smooth the crack by polymer mortar. |
7 | Slotting and Wiring |
Adopting hand-electric saw to cut the slotting for switch box or concealed line if needed, smooth the slotting by polymer mortar after installation. |
8 | Sticking Anti-Crack Tape | Sticking anti-crack tape in 3-5 days after grouting to prevent crack which may caused by long time expansion or contraction. |
9 | Installing Door Frame |
Reserve holes for door and window, and fixing the holes by plywood line anchor. |
10 | Decoration |
Sandwich wall panel do not need extra plaster for the surface, decorating the wall surface directly by tiles, wallpaper or other painting. |