Customization: | Available |
---|---|
After-sales Service: | 5years |
Application: | Exterior Wall Of Building, Roof, Wall Panel, Flooring |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dear friend, if you are interested in our product and have any problems, don't hesitate to e-mail me.
Freda Lin
EPS cement sandwich panels are designed with functionality in mind. The EPS foam core reduces heat transfer, helping to maintain a comfortable indoor temperature. The outer cement panels are resistant to moisture and physical damage. They are produced in a factory - controlled setting to ensure consistent quality. The panels can be customized in terms of size and appearance. Their light - weight nature simplifies installation, and they are suitable for a wide range of building applications, from single - family homes to large industrial facilities. They also contribute to reducing energy consumption in buildings.
EPS cement sandwich panel is a composite building material that consists of two outer layers of cement-based panels and a middle layer of expanded polystyrene (EPS) foam. The three layers are combined into one through special processes to form a unified structure with specific performance characteristics.
Main Components
EPS Core: The EPS core is made of polystyrene resin particles that are heated and expanded. It has a light weight, low density, and a large number of closed cells, which endow it with excellent insulation and shock absorption properties.
Cement Panels: The outer cement panels are usually made of Portland cement, mixed with fine aggregates, water, and certain additives. They provide strength, durability, and protection for the middle EPS layer.
Energy Efficiency
The low thermal conductivity of the EPS core makes EPS cement sandwich panels highly energy - efficient. They can effectively reduce heat transfer, maintaining a stable indoor temperature. This leads to lower energy consumption for heating and cooling systems, resulting in long - term cost savings for building owners.
Cost - Effective
In terms of construction costs, the lightweight nature of the panels reduces transportation and installation expenses. Their long lifespan and low maintenance requirements also contribute to cost - effectiveness. Additionally, the energy savings over time offset the initial investment, making them a cost - efficient choice in the long run.
Design Flexibility
These panels can be easily customized in terms of size, shape, and surface finish. They can be cut, drilled, and shaped to fit specific design requirements. The ability to choose from different colors and textures allows architects and designers to create unique and aesthetically pleasing building facades.
1 | Paying-off and Sandwich Wall Panels Arrived on Site | Adopting high precision laser alignment instrument to eject double lines of panel thickness on axial line of panel installation location, move the panel to the settled location according to different specifications. |
2 | Sawing Panel According to Requirement | Adopting hand-hold electric saw cutting the panel according to different need, make sure maximum using each panel to reduce the waste. |
3 | Sizing | Sizing the bump slots and even up the special ZJT panel adhesive into the bump slots and baseline of the floor. |
4 | Installation | Erected the painted panel with adhesive and move it to the prepared installation site, adjusting the panel to fit both of the baseline and tighten each panel to push the extra polymer mortar out of the joint crack, fixing the panel by wooden wedge. |
5 | Correction and Fixation |
Correcting the panel position by using 2m levelness & verticality straight guide rule, adopting expansion rubber together with 6mm or 8mm steel bar to fix the panel. |
6 | Grouting and Filling Thick Liquid | Leave the installed and corrected panel for one day, adopting BOYUEJIA special panel adhesive to filling the joint crack. Remove wooden wedge and smooth the crack by polymer mortar. |
7 | Slotting and Wiring |
Adopting hand-electric saw to cut the slotting for switch box or concealed line if needed, smooth the slotting by polymer mortar after installation. |
8 | Sticking Anti-Crack Tape | Sticking anti-crack tape in 3-5 days after grouting to prevent crack which may caused by long time expansion or contraction. |
9 | Installing Door Frame |
Reserve holes for door and window, and fixing the holes by plywood line anchor. |
10 | Decoration |
Sandwich wall panel do not need extra plaster for the surface, decorating the wall surface directly by tiles, wallpaper or other painting. |