Customization: | Available |
---|---|
Appliction: | Wall, Floor, Roof, Villa and Buildings etc |
Raw Materials: | Sand, Cement, Fly Ash, EPS etc. |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Length (mm) |
Width (mm) |
Thickness (mm) |
Utilize |
2270 2440 |
610 |
60 | roof for villa, prefabricated house, makeshift house, cabina |
75 | roof for villa, prefabricated house, makeshift house, cabina | ||
90 | interior partition wall for house, office building, residential, school, hotel | ||
100 | interior partition wall for high rise building, mansion, hospital | ||
120 | exterior wall for warehouse, commercial building; floor with structure | ||
150 | exterior wall for college, shopping mall, row house,commercial place |
1) Setting the line and carrying the board into position | Eject double lines of board thickness up and down the axes of installed wall board, and easily carry to the side of wall according to the specification needed; |
2) Sawing board | Using a hand-hold electric saw freely according to the specification of wall, which can reduce the loss rate; |
3) Sizing | Sizing the bump slots and then spread the baseline and the bump slots with the special adhesives; |
4) Installation | Carrying the board prepared to be installed to the installation place, correcting the wall board by gave lock and making it close tightly, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily; |
5) Correcting and fixing | Using the guiding rule of two meters to check the vertical and leveling correction. Then using 6mm reinforcing steel bar and ribs adding with construction sealant to fix; |
6) Grouting and filing starch | Using ZJT special adhesives to fill the gaps between the corrected wall boards after one day later. Then putting the chock out and letting the corrected wall smoothly with polymer mortar; |
7) Grooving and piping | Cutting a groove by hand-hold electric saw for buring the concealed wire and switch box, then filling with polymer mortar after installation; |
8) Sticking anti-cracking tape | After grouting 3-5 days later, sticking anti-crack tape if need second decoration or attaching fiber mesh cloth; |
9) Installing door case | Preparing a door and window hole on the installed wall, anchoraging it with splint or lines; |
10) Facing ceramic tile, decorative sheet, coating and wallpaper | Sticking ceramic tiles, or wood facing panels and coating directly on the installed wall without plastering; |