Fireproof 4 Hours Easy Installation Insulated EPS Wall Panels for Wall Building
Product Introduction
EPS cement Sandwich panel is composed of face panel and interior filling. The material of face panel is thin fiber cement board or calcium silicate board,and the middle is filled with lightweight composite core material, including cement, EPS and fly ash.
Product Advantages
The products has the advantage of Solid, Lightweight, Thin, Better Strenth, Impact Resistance, Hanging Strenth, Heat Insulation,Sound Insulation, Easy Cutting, Pet and Rot Resistance, Fireproof, Waterproof, Fast construction,Easy installation Increasing usable Space.
It can be arbitrarily slotted, without batch file, dry operation, environmental protection, which achieve energy
conservation and energy efficient. At the same time, it reduces the total area to be ocupied by the wall and to raise
residential practical area, alleviates the structure load, improves the building aseismatic capacity and safety performance, and reduce total cost.This production technology and application are the reform of the world materail, and a new breakthrough
in our country
Product Size
Item |
size |
2270*610/2240*610 |
thickness |
60mm |
75mm |
90mm |
100mm |
120mm |
150mm |
Surface density |
kg/m2 |
≤70 |
≤70 |
≤90 |
≤110 |
≤110 |
≤110 |
Moisture rate |
% |
≤10 |
≤10 |
≤10 |
≤8 |
≤8 |
≤8 |
Sound insulation |
dB |
≥35 |
≥35 |
≥40 |
≥42 |
≥45 |
≥50 |
Fireproof |
H |
≥1.5 |
≥1.5 |
≥2.5 |
≥3.0 |
≥3.0 |
≥4.5 |
The combustion properties of (AIorA2)
|
A1orA2 |
Product Application
widely used:
office,residential building,school,hospital,hotel,public construction,entertainment place.
wall/exterior wall/interior wall/super high wall/abnormity wall/roof/floor/prefab building/
pipe/fire well/equipment partiton
1).Interior partition (60/75/90mm is your best choice)
2).Exterior Wall (100/120/150mm for your reference)
3).Floor and roof
4).prefabricated houses
5).Modern high-rise Building
6).Schools, Hotels, office
7).Indoor space of ecological residences
8).All kinds of houses and structures
Installation Process
Notice:Adjustment have three steps. The first is reinforce on bottom. The second is reinforce on top. The third is reinforce on the left and right.
Certification
Packing & Delivery
1).Held by wooden Pallet or without Pallet;
2).Bonded with plastic belts;
3).Fasten around the corners;
Trade Terms
1).Payment: T/T or L/C at sight;
2).Lead time: 20-25 Working days;
3).Shipping freight are quoted under your requests;
4).Shipping port: Xiamen port, Mainland China;
5).Discount: based on the order quantity;
Company infomation
In the trend of low-carbon and energy-saving in domestic, ZJT is on a mission environmental protection, and actively promoting the development and popularization of green building materials. The composition of the materials of ZJT energy-saving wall panel strictly implements national GB6566-2001Building Materials Radionuclide Limited standard, which belong to the main of the radioactive building materials and a kind of decoration materials, 100% do not contain harmful substances in humans, and in high temperature combustion state, the release of excessive part also can be operated in an efficient range so it has no direct threat to human. At the same time, the construction of the product itself almost do not produce construction waste, in the demolition of buildings the product has the reuse rate of as high as 72%-93%, so these features make it surely become one of the most environmental protection administration of green environmental protection building materials.
Contact information
Allenby
Xiamen Zhongjingtai Building Materials Co.,Ltd